Trans-Alaska Pipeline

Trans Alaska Pipeline

Source: USGS.

The Trans-Alaska Pipeline System was constructed between 1975 and 1977 to move oil from the oil fields of northern Alaska to the northernmost ice-free port of Valdez, Alaska. Eleven pumping stations maintain the oil flow along the 1,300 km pipeline, which can carry up to 2.1 million barrels per day.